﻿{"id":10487,"date":"2023-10-05T21:46:46","date_gmt":"2023-10-05T16:46:46","guid":{"rendered":"http:\/\/invest-in-uzbekistan.org\/?p=10487"},"modified":"2023-10-05T21:46:46","modified_gmt":"2023-10-05T16:46:46","slug":"na-navoijskoj-tes-budet-postroen-novyj-energoblok-na-650-mvt","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/na-navoijskoj-tes-budet-postroen-novyj-energoblok-na-650-mvt\/","title":{"rendered":"A new 650 MW power unit will be built at the Navoi Thermal Power Plant"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>The Navoi Thermal Power Plant has signed a contract for the creation of a third energy unit, Spot <a href=\"https:\/\/www.spot.uz\/ru\/2023\/10\/05\/navoiy-power\/\">reports<\/a>, citing the press service of the Ministry of Energy.<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14pt;\">As the part of the project, it is planned to build and launch a combined cycle gas plant with a capacity of 650 megawatts. The construction of the power unit is included in the investment program of Uzbekistan until 2025, approved last December.<\/span><\/p>\n<blockquote>\n<p><span style=\"font-size: 14pt;\">The project will be implemented by the Japanese company Mitsubishi Power Ltd. The power unit is planned to be built and put into operation from 2023 to 2026.<\/span><\/p>\n<\/blockquote>\n<p><span style=\"font-size: 14pt;\">After launch, the power unit will generate and send 4.8 billion kWh of electricity to the general power grid. Thanks to the use of modern energy-efficient equipment, up to 1 billion cubic meters of gas will be saved compared to old units.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">In July, construction of new power units with a capacity of 1 GW <a href=\"https:\/\/www.spot.uz\/ru\/2023\/07\/25\/talimarjon-expand\/\">began<\/a> at the Talimarjan Thermal Power Plant. The Japanese Mitsubishi together with the Spanish Intecsa are also working on the project costing over $770 million.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>The Navoi Thermal Power Plant has signed a contract for the creation of a third energy unit, Spot reports, citing the press service of the Ministry of Energy. As the&#8230;<\/p>\n","protected":false},"author":1,"featured_media":10488,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-10487","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=10487"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10487\/revisions"}],"predecessor-version":[{"id":10489,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10487\/revisions\/10489"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/10488"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=10487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=10487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=10487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}