﻿{"id":10747,"date":"2023-11-10T21:14:39","date_gmt":"2023-11-10T16:14:39","guid":{"rendered":"http:\/\/invest-in-uzbekistan.org\/?p=10747"},"modified":"2023-11-10T21:14:39","modified_gmt":"2023-11-10T16:14:39","slug":"voltalia-dogovorilas-o-stroitelstve-v-uzbekistane-dvuh-elektrostantsij","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/voltalia-dogovorilas-o-stroitelstve-v-uzbekistane-dvuh-elektrostantsij\/","title":{"rendered":"Voltalia agreed to build two power plants in Uzbekistan"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>Voltalia has entered into agreements with the government of Uzbekistan to implement two green energy projects, Spot <a href=\"https:\/\/www.spot.uz\/ru\/2023\/11\/10\/voltalia\/\">reports<\/a>, citing Energy Storage News.<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The signing of the relevant documents took place a week earlier, on the sidelines of the Uzbek-French business forum. It is noted that both projects will include energy storage systems.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Thus, Voltalia signed a protocol on the implementation of a hybrid power plant project in Shurkul near Navoi with a total capacity of 400 MW. A preliminary agreement on it was drawn up in November last year, after Shavkat Mirziyoyev\u2019s visit to France.<\/span><\/p>\n<blockquote>\n<p><span style=\"font-size: 14pt;\">The power plant will combine a wind farm and a solar photopanel farm with a capacity of 200 MW each. The complex will also include a 60 MW battery system (with a total capacity of 240 MWh).<\/span><\/p>\n<\/blockquote>\n<p><span style=\"font-size: 14pt;\">As previously reported, the \u201celectric cluster\u201d is expected to be put into operation in 2026. Voltalia called it the first facility of its kind in\u00a0Central Asia.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The second power plant will be located in Sarymay, Khorezm region. Voltalia won the tender for its construction in 2022, offering a price of 2.888 cents per 1 kWh.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Initially it was assumed that there would be a PV plant with a capacity of 100 MW. However, now the projected capacity has increased to 123 MW, and the company has also signed a protocol for the construction of a 100 MW wind farm and battery system here.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">In July, Voltalia opened a new office in Tashkent. The French Ambassador to Uzbekistan, Aurelia Bouchez, attended the ceremony.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Voltalia has entered into agreements with the government of Uzbekistan to implement two green energy projects, Spot reports, citing Energy Storage News. The signing of the relevant documents took place&#8230;<\/p>\n","protected":false},"author":1,"featured_media":10748,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-10747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=10747"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10747\/revisions"}],"predecessor-version":[{"id":10749,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/10747\/revisions\/10749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/10748"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=10747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=10747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=10747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}