﻿{"id":12394,"date":"2024-07-02T18:49:28","date_gmt":"2024-07-02T13:49:28","guid":{"rendered":"https:\/\/invest-in-uzbekistan.org\/?p=12394"},"modified":"2024-07-02T18:49:28","modified_gmt":"2024-07-02T13:49:28","slug":"rassmotreno-sostoyanie-obespecheniya-energoeffektivnosti","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/rassmotreno-sostoyanie-obespecheniya-energoeffektivnosti\/","title":{"rendered":"The state of energy efficiency was considered"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>On July 1, President Shavkat Mirziyoyev got acquainted with the report on measures to improve energy efficiency in industries and regions, the press service of the head of our state <a href=\"https:\/\/president.uz\/ru\/lists\/view\/7365\">reports<\/a>.<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><a href=\"https:\/\/invest-in-uzbekistan.org\/novosti-uzbekistana\/rassmotreno-sostoyanie-obespecheniya-energoeffektivnosti\/attachment\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_\/\" rel=\"attachment wp-att-12395\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-12395\" src=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_-1024x682.jpg\" alt=\"\" width=\"1024\" height=\"682\" srcset=\"https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_-1024x682.jpg 1024w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_-300x200.jpg 300w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_-768x512.jpg 768w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_-254x169.jpg 254w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/181f8d71-d2bc-616b-18d3-395dd6ce4cef_lists_slider_.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/span><\/p>\n<p><span style=\"font-size: 14pt;\">As the population and the number of enterprises and institutions grow, the demand for energy resources increases. Our country is taking appropriate measures to increase generating capacity and develop alternative energy sources. At the same time, it is very important to use this power rationally and save energy.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">For this purpose, old technologies in economic sectors are replaced by energy-saving ones. Sources of \u201cgreen\u201d energy are being introduced at industrial enterprises. Thermal insulation materials are used in the construction of buildings. Solar panels installed in homes and social institutions provide them with additional power.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">At the beginning of this year, targets for saving electricity and natural gas in the regions were formed. They are aimed at saving certain amounts through efficient organization of energy consumption, without interfering with production.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The ongoing work in this direction was reviewed at the meeting.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">A high share of theft in energy consumption is indicated.For example, this year the theft of natural gas was detected in 15 thousand cases and electricity in 28 thousand cases. The reason for this is that the fight is not with prevention, but with the consequences of illegal connections.<\/span><\/p>\n<p><a href=\"https:\/\/invest-in-uzbekistan.org\/novosti-uzbekistana\/rassmotreno-sostoyanie-obespecheniya-energoeffektivnosti\/attachment\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_\/\" rel=\"attachment wp-att-12396\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-12396\" src=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_-1024x682.jpg\" alt=\"\" width=\"1024\" height=\"682\" srcset=\"https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_-1024x682.jpg 1024w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_-300x200.jpg 300w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_-768x512.jpg 768w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_-254x169.jpg 254w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/71ef8dbf-8c3a-630b-68c6-1ad65680cfd2_lists_slider_.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p><span style=\"font-size: 14pt;\">In this regard, the need to prevent such situations, strictly monitor energy consumption, and increase the responsibility of officials was noted.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">In cooperation with foreign companies, a number of projects are being implemented in the industry and power plants are being built. This year, using all sources, it is planned to launch power plants with a capacity of 4 gigawatts.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The head of our state emphasized the need for high-quality implementation of investment projects and agreements reached with foreign partners.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The meeting also provided information on preparations for the autumn-winter season.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">It was noted that work had begun on repairing 850 kilometers of trunk networks and 9 substations. In addition, 595 kilometers of power transmission lines will be built and a number of new substations will be commissioned. Reserves of fuel, components and spare parts necessary for stable operation of thermal stations are being formed.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Responsible officials are tasked with increasing energy production, modernizing infrastructure and ensuring uninterrupted energy supply.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>On July 1, President Shavkat Mirziyoyev got acquainted with the report on measures to improve energy efficiency in industries and regions, the press service of the head of our state&#8230;<\/p>\n","protected":false},"author":1,"featured_media":12395,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-12394","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/12394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=12394"}],"version-history":[{"count":2,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/12394\/revisions"}],"predecessor-version":[{"id":12398,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/12394\/revisions\/12398"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/12395"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=12394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=12394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=12394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}