﻿{"id":13747,"date":"2024-12-02T14:05:26","date_gmt":"2024-12-02T09:05:26","guid":{"rendered":"https:\/\/invest-in-uzbekistan.org\/?p=13747"},"modified":"2024-12-02T14:05:26","modified_gmt":"2024-12-02T09:05:26","slug":"sinoma-ec-international-postroit-solnechnuyu-elektrostantsiyu-v-uzbekistane","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/sinoma-ec-international-postroit-solnechnuyu-elektrostantsiyu-v-uzbekistane\/","title":{"rendered":"\u2018\u2018Sinoma EC International\u2019\u2019 will build a solar power plant in Uzbekistan"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>On November 29 of this year, at the Ministry of Investment, Industry and Trade, the Investment Agreement for the construction of a 300 MW solar power plant and a 75 MW energy storage system in the Karmana district of the Navoi region of the Republic of Uzbekistan was signed, the press service of the Ministry <a href=\"https:\/\/gov.uz\/en\/miit\/news\/view\/28981\">reports<\/a>.\u00a0<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><a href=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_.webp\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-13748\" src=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_-1024x683.webp\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_-1024x683.webp 1024w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_-300x200.webp 300w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_-768x512.webp 768w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_-254x169.webp 254w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1fd84ecf-03da-babe-bea9-83eae59d9386_lists_slider_.webp 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The ceremony was attended by Laziz Kudratov, Minister of Investment, Industry and Trade, and Zo Duyun, General Director of \u2018\u2018Sinoma EC International Investment Co.,Ltd\u2019\u2019.\u00a0<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">As noted, the launch of the project will be another major step towards the implementation of the \u2018\u2018Uzbekistan-2030\u2019\u2019 Strategy, which aims to increase the share of renewable energy sources to 25,000 megawatts and the share in the country&#8217;s total consumption &#8211; to 40%.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Reference: \u2018\u2018Sinoma EC International Investment Co., Ltd.\u2019\u2019 is a subsidiary of \u2018\u2018Sinoma Energy Conservation Co., Ltd.\u2019\u2019, established in 1987. The company&#8217;s capitalization is $600 billion, and the number of employees is 2,000. The company specializes in the construction of WHR power plants using the heat from industrial gas exhausts, as well as power plants based on biomass, geothermal and solar energy. The company&#8217;s portfolio includes more than 1,000 projects implemented worldwide.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>On November 29 of this year, at the Ministry of Investment, Industry and Trade, the Investment Agreement for the construction of a 300 MW solar power plant and a 75&#8230;<\/p>\n","protected":false},"author":1,"featured_media":13748,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-13747","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/13747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=13747"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/13747\/revisions"}],"predecessor-version":[{"id":13749,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/13747\/revisions\/13749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/13748"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=13747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=13747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=13747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}