﻿{"id":14392,"date":"2025-04-21T19:00:56","date_gmt":"2025-04-21T14:00:56","guid":{"rendered":"https:\/\/invest-in-uzbekistan.org\/?p=14392"},"modified":"2025-04-21T19:00:56","modified_gmt":"2025-04-21T14:00:56","slug":"predstavlena-informatsiya-po-proektam-v-sfere-alternativnoj-energetiki","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/predstavlena-informatsiya-po-proektam-v-sfere-alternativnoj-energetiki\/","title":{"rendered":"Information on projects in the field of alternative energy was presented"},"content":{"rendered":"<strong>President Shavkat Mirziyoyev was informed about the progress of tasks in the energy sector and the implementation of new projects, the press service of the head of our state <a href=\"https:\/\/president.uz\/ru\/lists\/view\/8068\">reports<\/a><\/strong><strong>.<\/strong><\/p>\n<p><a href=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-14393\" src=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068-1024x682.jpg\" alt=\"\" width=\"1024\" height=\"682\" srcset=\"https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068-1024x682.jpg 1024w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068-300x200.jpg 300w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068-768x512.jpg 768w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068-254x169.jpg 254w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/2e58e87b-30ab-71df-83dd-faaad6406854_lists_slider_8068.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>In order to meet the growing needs of the population for energy resources, many projects are implemented annually. As a result of these efforts, over the past five years, the volume of electricity production has increased by 30 percent and reached 81.5 billion kilowatt-hours.<\/p>\n<p>According to calculations, by 2035, electricity consumption in our country will amount to 121 billion kilowatt-hours. In this regard, measures are already being taken today to develop all areas of energy. By 2030, the share of &#8220;green&#8221; energy in the total generation volume is planned to be increased to 54 percent.<\/p>\n<p>Hydropower and nuclear energy are considered the most promising areas.<\/p>\n<p>In particular, in 2025-2026, it is planned to build 2,983 micro-hydroelectric power plants with a total capacity of 167 megawatts. These facilities will generate 500 million kilowatt-hours of clean energy annually and save 151 million cubic meters of natural gas. 1,200 people will be involved in the construction phase, and 520 permanent employees after commissioning.<\/p>\n<p><a href=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-14394\" src=\"http:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068-1024x682.jpg\" alt=\"\" width=\"1024\" height=\"682\" srcset=\"https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068-1024x682.jpg 1024w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068-300x200.jpg 300w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068-768x512.jpg 768w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068-254x169.jpg 254w, https:\/\/invest-in-uzbekistan.org\/wp-content\/uploads\/1481a81d-a71a-ac5d-cc09-058b204805bf_lists_slider_8068.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>The Minister of Energy presented information on the projects planned for the current year. This year, it is planned to commission 1,185 micro-hydroelectric power plants with a total capacity of 65 megawatts, most of which will be implemented by entrepreneurs.<\/p>\n<p>It is also planned to use nuclear energy as one of the basic sources in the future. Work is currently underway on a project to build a low-power nuclear power plant. All stages &#8211; from design to launch &#8211; will be carried out under the strict control of the International Atomic Energy Agency (IAEA) using the best world practices and safety requirements.<\/p>\n<p>The head of the Uzatom agency reported on the agreements reached, the progress of negotiations and the implementation of the project.<\/p>\n<p>Instructions were given for the timely commissioning of facilities and the provision of additional energy to the population and economic sectors.","protected":false},"excerpt":{"rendered":"<p>President Shavkat Mirziyoyev was informed about the progress of tasks in the energy sector and the implementation of new projects, the press service of the head of our state reports&#8230;.<\/p>\n","protected":false},"author":1,"featured_media":14393,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-14392","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/14392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=14392"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/14392\/revisions"}],"predecessor-version":[{"id":14395,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/14392\/revisions\/14395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/14393"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=14392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=14392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=14392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}