﻿{"id":9282,"date":"2023-03-23T21:27:27","date_gmt":"2023-03-23T16:27:27","guid":{"rendered":"http:\/\/invest-in-uzbekistan.org\/?p=9282"},"modified":"2023-03-23T21:27:27","modified_gmt":"2023-03-23T16:27:27","slug":"vokrug-tashkenta-postroyat-chetyre-fotoelektrostantsii-na-2-4-gvt","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/vokrug-tashkenta-postroyat-chetyre-fotoelektrostantsii-na-2-4-gvt\/","title":{"rendered":"Four 2.4 GW photoelectric power plants will be built around Tashkent"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>According to the <a href=\"https:\/\/www.spot.uz\/ru\/2023\/03\/18\/new-tashkent\/\">report<\/a> of Spot, Shavkat Mirziyoyev took part in the ceremony of laying the foundation stone for the New Tashkent town.<\/strong><\/span><\/p>\n<blockquote>\n<p><span style=\"font-size: 14pt;\">In his speech, the head of state <a href=\"https:\/\/t.me\/Press_Secretary_Uz\/2992\">highlighted<\/a> the need to solve problems in the energy sector for the development of Tashkent. Over the past 6 years, electricity consumption in the capital has increased by 30% and has approached 8 billion kWh.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-15065\" src=\"http:\/\/sverenins.uz\/wp-content\/uploads\/lYOBVG16091499520519_b.jpg\" alt=\"\" width=\"680\" height=\"381\" \/><\/span><\/p>\n<\/blockquote>\n<p><span style=\"font-size: 14pt;\">At the same time, electricity is supplied to the entire city through one high-voltage power line in Yunusabad, and the substation infrastructure is outdated. A large-scale program for the reorganization of Tashkent&#8217;s power supply, which was announced by the president, is called upon to solve this problem.<\/span><\/p>\n<blockquote>\n<p><span style=\"font-size: 14pt;\">To meet the increased demand in the Tashkent region, four photovoltaic power plants with a total capacity of 2,400 MW <a href=\"https:\/\/t.me\/Press_Secretary_Uz\/2993\">will be built<\/a>. It is planned to attract $2 billion of direct investments for this.<\/span><\/p>\n<\/blockquote>\n<p><span style=\"font-size: 14pt;\">The largest solar power plant &#8211; for 1000 MW &#8211; will be created near Akhangaran. In Yukorichirchik and Kibray districts, it <a href=\"https:\/\/www.spot.uz\/ru\/2023\/03\/11\/energy-for-tashkent\/\">was instructed<\/a> to launch two more solar farms for 700 and 400 MW, respectively. The fourth station with a capacity of 300 MW will be built in Buka.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The implementation of all four projects will increase electricity generation by 6 billion kWh per year, Mirziyoyev said. According to calculations, this volume will cover the needs of 2 million people and 30 thousand enterprises.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">For a stable supply of electricity in the capital, new high-voltage networks will be built and substations will be upgraded. The President announced plans for the reconstruction of heating boiler houses to introduce technologies for cogeneration of heat and electricity.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>According to the report of Spot, Shavkat Mirziyoyev took part in the ceremony of laying the foundation stone for the New Tashkent town. In his speech, the head of state&#8230;<\/p>\n","protected":false},"author":1,"featured_media":9283,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-9282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=9282"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9282\/revisions"}],"predecessor-version":[{"id":9284,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9282\/revisions\/9284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/9283"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=9282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=9282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=9282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}