﻿{"id":9710,"date":"2023-05-25T20:45:27","date_gmt":"2023-05-25T15:45:27","guid":{"rendered":"http:\/\/invest-in-uzbekistan.org\/?p=9710"},"modified":"2023-05-25T20:45:27","modified_gmt":"2023-05-25T15:45:27","slug":"obyavlen-predvaritelnyj-pobeditel-tendera-na-stroitelstvo-solnechnoj-fotoelektricheskoj-stantsii-v-kashkadare","status":"publish","type":"post","link":"https:\/\/invest-in-uzbekistan.org\/en\/novosti-uzbekistana\/obyavlen-predvaritelnyj-pobeditel-tendera-na-stroitelstvo-solnechnoj-fotoelektricheskoj-stantsii-v-kashkadare\/","title":{"rendered":"The preliminary winner of the tender for the construction of a solar photovoltaic plant in Kashkadarya has been announced"},"content":{"rendered":"<p><span style=\"font-size: 14pt;\"><strong>Today, May 24, the preliminary winner of the tender for the construction and operation of a 300 MW solar photovoltaic plant in the Guzor district of Kashkadarya region was announced, the press service of the Ministry of Energy of the Republic of Uzbekistan <a href=\"https:\/\/minenergy.uz\/ru\/news\/view\/2852\">reports<\/a>.<\/strong><\/span><\/p>\n<p><span style=\"font-size: 14pt;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-15527\" src=\"http:\/\/sverenins.uz\/wp-content\/uploads\/0a11d68f-8595-0c2c-536f-be3c0338017c_news_.jpg\" alt=\"\" width=\"1200\" height=\"799\" \/><\/span><\/p>\n<p><span style=\"font-size: 14pt;\">This project is being implemented with the support of the Asian Development Bank (ADB) under the &#8220;Project Development and Advisory Services Program for the Construction of a Solar Photovoltaic Plant with a Total Capacity of 300 MW&#8221; (Phase 2 of ADB).<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Two (2) international companies submitted their proposals for the implementation of this project. Results of the opening of financial proposals:<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">1. <strong>Abu Dhabi Future Energy Company PJSC &#8211; Masdar Company (UAE)<\/strong> offered <strong>3.0000 US cents<\/strong> per 1 kWh of electricity generated by a solar power plant and <strong>6.33 US dollars<\/strong> per 1 MWh of battery system availability.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">2. <strong>ACWA POWER-Saudi Listed Stock Company (Saudi Arabia)<\/strong> offered <strong>3.0518 US cents<\/strong> per 1 kWh of electricity produced by a solar power plant and <strong>24.425 US dollars<\/strong> per 1 MWh of a battery system.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">Within the framework of the project &#8220;Construction of a solar photovoltaic power plant with a capacity of 300 MW in the Guzor district of Kashkadarya region&#8221;, the company &#8220;<strong>Abu Dhabi Future Energy Company PJSC &#8211; Masdar&#8221; is declared the preliminary winner of the tender, and the reserve winner of the tender is the company &#8220;ACWA POWER-Saudi Listed Stock Company&#8221;<\/strong> .<\/span><\/p>\n<p><strong><span style=\"font-size: 14pt;\">Tender documents will be reviewed and approved by the Tender Commission with the participation of ADB consultants in the coming days.<\/span><\/strong><\/p>\n<p><span style=\"font-size: 14pt;\">This tender was held by the Ministry of Energy, the Ministry of Investments, Industry and Trade, National Electric Networks of Uzbekistan JSC, the Ministry of Economy and Finance and the Committee for the Development of Competition and Consumer Rights Protection.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The project includes a solar photovoltaic plant with a capacity of 300 MW in the Guzor region and an energy storage system (battery) providing 75 MW of power for 1 hour.<\/span><\/p>\n<p><span style=\"font-size: 14pt;\">The winning investor will design, finance and operate the solar PV plant for 25 years.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Today, May 24, the preliminary winner of the tender for the construction and operation of a 300 MW solar photovoltaic plant in the Guzor district of Kashkadarya region was announced,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":9707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-9710","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti-uzbekistana"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/comments?post=9710"}],"version-history":[{"count":1,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9710\/revisions"}],"predecessor-version":[{"id":9711,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/posts\/9710\/revisions\/9711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media\/9707"}],"wp:attachment":[{"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/media?parent=9710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/categories?post=9710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/invest-in-uzbekistan.org\/en\/wp-json\/wp\/v2\/tags?post=9710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}